Intergraph!  

1992-1993

InRoads InSewer InFlow  - Water Resource Engineering Certification and Support Lead.

Leaving Huntsville

 

Big Projects = Collaboration & Quality

HNTB 1993-1995

In a small, tight group, you didn't lose a lot of productivity with handoffs or poor communications.

It wasn't until working within design teams in a multi-disciplined organization on big integrated projects that it became obvious that fast-typing was not only NOT a reliable way to increase productivity. Hurrying was, in fact, a reliable way to reduce quality.  Improving the system speed saved a lot more time than clicking faster.  Better tools, better handoffs: better systems. 

Fuller Warren Bridge 1995 - I-95 Jacksonville FL
Fuller Warren Bridge 1995

 

City #1

1995-2000

1995 - City of San Diego - Engineering Applications